The grid on the map

Fortescue’s mines, solar and wind sites, 220 kV transmission and indicative charging hubs.

All slides · Open in the deck · Change log

Fortescue reports 1.5 GW of solar, 900 MW of wind, 4–5 GWh of batteries and 660 km of transmission for its Pilbara decarbonisation, with 550 km built and 110 km under construction (FY26 annual report). The charging hub locations are ITK’s, and indicative only. Zoom and pan the map; the layer button switches the background.